000 01392nam a2200349 a 4500
005 20230213143926.0
008 091126s1999 enkm m001 0 eng d
020 _a084930024X
_c307 Bht.
020 _a9780849300240
040 _aSPU
049 _bSPU-BK
050 0 4 _aTA 190
_bG66E 1999
100 1 _aGoodman, Louis J.
_9167299
245 1 0 _aEngineering project management :
_bthe IPQMS method and case histories /
_cLouis J. Goodman and Rufino S. Ignacio.
260 _aLondon :
_bCRC Press,
_c1999
300 _a214 p. :
_bill.
449 _a110105
500 _aIndex
505 0 _aA case for infrastructure renewal with accountability
505 0 _aThe integrated planning and quality management system (IPQMS)
505 0 _aGuidelines for researching and writing IPQMS case histories
505 0 _aThe trans-alaska pipeline system (TAPS): planning, design, and construction
505 0 _aThe EPA superfund programs 1,2, and 3
505 0 _aHow to use lessons learned in rebuilding infrastructure and cleaning the environment
650 0 _aENGINEERING
_xMANAGEMENT
_935156
650 0 _aQUALITY CONTROL
_940869
700 1 0 _aIgnacio, Rufino S.
_9167300
910 _aอ.มนต์ผกา
_bถ่ายเอกสารพระจอมเกล้าธนบุรี
_c251109
942 _cGEN
998 _ajirawan 1109
_bjirawan 1109
999 _c139625